
The City Hall building was originally constructed in 1892 in three months and four days, and is now on the National Register of Historic Places. LORIS performed a site structural investigation to determine the structure’s complex load path, and to identify which interior walls were load-bearing and could not be removed in the proposed renovation. A floor analysis of the numerous first-floor conditions was performed to verify existing floor loading capacities.