SH 119 Bikeway Improvements – Boulder County, CO

Powered by Cincopa WordPress pluginAnother great product from Cincopa Send Large Files. Also read about Cincopa wordpress plugins for your website.

LORIS provided engineering design services for two locations on SH 119 between Longmont and Boulder. The first is a bicycle bridge over Left Hand Creek adjacent to the northbound vehicular bridge and also included the bicycle path approaches to the bridge. The second location is at the intersection of SH 119 and SH 52. LORIS prepared construction documents (plans, specifications, and engineer’s opinion of probable cost) for the addition of bicycle lanes at the approaches to both roadways.