Airport Road Bridge – Boulder County, CO

Powered by Cincopa WordPress pluginAnother great product from Cincopa Send Large Files. Also read about Cincopa wordpress plugins for your website.

LORIS engineered nearly one mile of improvements to Airport Road, as well as a bridge replacement over Left Hand Creek and improvements to SH 119. Work included grading, drainage, pavement design, floodway design of Left Hand Creek, and roadway hydraulics. The bridge is a one-span, 68.5-ft. long by 72.5-ft. wide pre-stressed structure with aesthetic detailing reminiscent of local agricultural buildings. The total construction cost of the project was estimated at $2.4 million.